Datum

Weir Street

Sheffield · Mixed use · 2024– · On site

A long concrete and glass volume cantilevering over a dark reflecting pool at blue hour

A shifted stack over a courtyard block, holding a public route through the middle of the site rather than around it.

The site had a right of way running diagonally across it that every previous scheme tried to close. We kept it, and built the courtyard block around it, so the shortcut people already used became the front door.

Above, four volumes step off each other to keep the tower off the neighbouring party wall and to give every upper floor a terrace where the shift happens. The cantilever at level six carries the shared floor out over the route.

The frame is in-situ concrete, left as struck. We specified the shuttering board pattern rather than the finish, which is the only way to get an honest answer from a contractor about what it will look like.

← All work
  • Area14,200 m²
  • StructureIn-situ concrete frame
  • StatusOn site, completing 2027
  • ClientWithheld

Studio

  • Practice
  • People
  • Careers

Work

  • All projects
  • On site
  • In design

Contact

  • hello@datum.example
  • Newsletter

DATUM is a fictional architecture practice built as a portfolio demonstration by Studio Super-Hi. Every project, client, award and date on this site is invented, and the building shown in the opening sequence is a study model made for this demonstration.